SP Group

Contact Us — Get in Touch

Talk to SP Group about shore power systems engineered for extreme cold down to −45 °C. Email us at info@sp-hinar.com — we reply within 48 hours.

We quote to your specification — production and delivery in 15–30 days.

Response Time
Within 48 hours
Lead Time
15–30 days
Markets Served
Worldwide
hero-terminal-aerial
Shore Power
Shore Power Cable Management Systems
Quoted to your specification

Cable reels, boxes and cabinets engineered for ports and terminals.

Extreme Cold
Down to −45 °C
Protection
IP56 / IP65 / IP66 / IP67
Certifications
CCS / TÜV / DNV / LR / ABS / BV

A container terminal served by SP Group shore power systems.

Extreme cold down to −45 °C

Customisation

Built to Your Requirements

Cable reels, electrical cabinets and systems are customised to your duty, your system and your environment.

011

Cable Reels Built to Your Duty

Cable reels built to your duty.

Motor-Driven / Spring-Driven
022

Electrical Cabinets Configured to Your System

Boxes and cabinets can be supplied standalone or as components of a complete system, customized per project.

Standalone / Complete System
033

Engineered for Your Environment

Protection ratings IP56 / IP65 / IP66 / IP67 customisable to requirements.

IP56 / IP65 / IP66 / IP67

Reach us

How to Reach Us

Email us at info@sp-hinar.com — we reply within 48 hours and quote to your specification.

Email

info@sp-hinar.com

For product questions, quotations and project enquiries.

Response Time

Within 48 hours

We reply to every enquiry within 48 hours.

Lead Time

15–30 days

Production and delivery in 15–30 days, quoted to your specification.

Markets Served

Worldwide

Ports, terminals and industrial sites worldwide.

Contact

Send an Enquiry — Quoted to Your Specification

Share your product, voltage, cable and installation details — we reply within 48 hours with a quotation to your specification.

Email
info@sp-hinar.com
What to Include in Your Enquiry
Product / equipment type; voltage & current; cable specification; installation location and use environment.
Product Literature
Catalogues available in blurred form on request.
Response Time
Within 48 hours

Enquiry Form

Send an Enquiry

Tell us about your application and we will quote to your specification.

0/120
0/300

The company or organisation making the enquiry.

Select the product or solution you are enquiring about.

Select the application or industry for your enquiry.

0/1200

The cable specification required.

0/300

Required if you selected Other above.

Select the installation location.

0/300

Required if you selected Other above.

0/300

The voltage and current required.

Select all that apply.

0/300

Optional — the vessel or equipment the product is for.

0/300

Required if you selected Other above.

0/1200

Next Steps

What Happens Next

Send your enquiry and we take it from there.

Step 11

We Reply Within 48 Hours

We reply to your enquiry within 48 hours.

Within 48 hours
Step 22

We Quote to Your Specification

We quote to your specification.

Quoted to Specification
Step 33

Production and Delivery in 15–30 Days

Production and delivery in 15–30 days.

15–30 days

About SP Group

About SP Group

SP Group supplies shore power cable management systems, boxes and electrical cabinets — customised to your duty, your system and your environment.

Certifications: CCS / TÜV / DNV / LR / ABS / BV. Email info@sp-hinar.com — we reply within 48 hours and quote to your specification.

hero-terminal-aerial
A container terminal served by SP Group shore power systems.